Module 02 · Category Wedge
AI Cooling Opportunity Engine
Liquid Cooling %
82%
+12.4 pts
Direct-to-Chip
48
Immersion
24
Rear-Door HX
63
Hybrid
69
Retrofit Pipeline
58
Thermal Risk Idx
0
2030 Liquid Forecast
95%
Cooling Architecture Trend
Share of facilities by cooling type · 2021 → 2030 forecast
Architecture Mix
Current distribution
Air46
Hybrid69
Rear-Door HX63
Direct-to-Chip48
Immersion24
Rack Density Transition Model
Average kW/rack across AI portfolio · 20 → 150+ kW evolution
Legacy
20 kW
Tier 1
40 kW
Tier 2
80 kW
Tier 3
120 kW
GB200+
150 kW
Regional Cooling Composition
Facility count by architecture
ZutaCore Fit Lens
Single-phase D2C buying signature · weighted across 10 drivers
AWS · London
London IDC-3
ZutaCore Fit
91
91
HotRear-Door HX115 kW/rack189 MW AI
Best sales motion
EPC-led technical workshop with Jacobs thermal practice
Primary wedge
Direct-to-chip retrofit for 115 kW+ AI racks
Risk
Standard execution risk — competitive D2C field
Top score drivers
High rack density · 115 kW/rack+18
AI MW expansion · 189 MW AI allocation+14
Open procurement window · Specification+12
Why we believe this
4 confirmed · 0 directional
- 1.Hiring spike in thermal engineeringConfirmed7 thermal/MEP reqs in 90d at AWS
- 2.EPC relationship detectedConfirmedJacobs owns thermal spec on this build
- 3.Expansion announcementConfirmedPermit filing — 332MW build, 189MW AI-allocated
- 4.Expert validation capturedConfirmedCooling spec ownership confirmed · verified 8 days ago
Digital Realty · Milan
Milan Edge-11
ZutaCore Fit
91
91
HotHybrid144 kW/rack92 MW AI
Best sales motion
EPC-led technical workshop with Burns & McDonnell thermal practice
Primary wedge
Direct-to-chip retrofit for 144 kW+ AI racks
Risk
Standard execution risk — competitive D2C field
Top score drivers
High rack density · 144 kW/rack+18
Direct-to-chip suitability · Hybrid — D2C upgrade path open+12
Open procurement window · Specification+12
Why we believe this
4 confirmed · 0 directional
- 1.Hiring spike in thermal engineeringConfirmed6 thermal/MEP reqs in 90d at Digital Realty
- 2.EPC relationship detectedConfirmedBurns & McDonnell owns thermal spec on this build
- 3.Expansion announcementConfirmedPermit filing — 308MW build, 92MW AI-allocated
- 4.Expert validation capturedConfirmedCooling spec ownership confirmed · verified 1 days ago
Vantage · Sydney
Sydney DC-6
ZutaCore Fit
90
90
HotHybrid103 kW/rack143 MW AI
Best sales motion
EPC-led technical workshop with AECOM thermal practice
Primary wedge
Direct-to-chip retrofit for 103 kW+ AI racks
Risk
Standard execution risk — competitive D2C field
Top score drivers
High rack density · 103 kW/rack+18
Direct-to-chip suitability · Hybrid — D2C upgrade path open+12
Open procurement window · RFP+12
Why we believe this
4 confirmed · 0 directional
- 1.Hiring spike in thermal engineeringConfirmed7 thermal/MEP reqs in 90d at Vantage
- 2.EPC relationship detectedConfirmedAECOM owns thermal spec on this build
- 3.Expansion announcementConfirmedPermit filing — 377MW build, 143MW AI-allocated
- 4.Expert validation capturedConfirmedCooling spec ownership confirmed · verified 11 days ago
NTT · Frankfurt
Frankfurt IDC-3
ZutaCore Fit
89
89
HotDirect-to-Chip102 kW/rack198 MW AI
Best sales motion
EPC-led technical workshop with Mace thermal practice
Primary wedge
Direct-to-chip retrofit for 102 kW+ AI racks
Risk
Standard execution risk — competitive D2C field
Top score drivers
High rack density · 102 kW/rack+18
AI MW expansion · 198 MW AI allocation+14
Open procurement window · Specification+12
Why we believe this
4 confirmed · 0 directional
- 1.Hiring spike in thermal engineeringConfirmed8 thermal/MEP reqs in 90d at NTT
- 2.EPC relationship detectedConfirmedMace owns thermal spec on this build
- 3.Expansion announcementConfirmedPermit filing — 305MW build, 198MW AI-allocated
- 4.Expert validation capturedConfirmedCooling spec ownership confirmed · verified 10 days ago
Oracle · Madrid
Madrid DC-6
ZutaCore Fit
89
89
HotRear-Door HX137 kW/rack186 MW AI
Best sales motion
EPC-led technical workshop with Black & Veatch thermal practice
Primary wedge
Direct-to-chip retrofit for 137 kW+ AI racks
Risk
Standard execution risk — competitive D2C field
Top score drivers
High rack density · 137 kW/rack+18
AI MW expansion · 186 MW AI allocation+14
Open procurement window · Specification+12
Why we believe this
3 confirmed · 1 directional
- 1.EPC relationship detectedConfirmedBlack & Veatch owns thermal spec on this build
- 2.Expansion announcementConfirmedPermit filing — 423MW build, 186MW AI-allocated
- 3.Expert validation capturedConfirmedCooling spec ownership confirmed · verified 3 days ago
- 4.Hiring spike in thermal engineeringDirectional10 thermal/MEP reqs in 90d at Oracle
Oracle · Paris
Paris IDC-7
ZutaCore Fit
88
88
HotDirect-to-Chip144 kW/rack332 MW AI
Best sales motion
RFP response — submit within 60d, lead with retrofit-grade D2C
Primary wedge
Direct-to-chip retrofit for 144 kW+ AI racks
Risk
Standard execution risk — competitive D2C field
Top score drivers
High rack density · 144 kW/rack+18
AI MW expansion · 332 MW AI allocation+14
Open procurement window · Specification+12
Why we believe this
4 confirmed · 0 directional
- 1.EPC relationship detectedConfirmedTurner owns thermal spec on this build
- 2.Expansion announcementConfirmedPermit filing — 395MW build, 332MW AI-allocated
- 3.Expert validation capturedConfirmedCooling spec ownership confirmed · verified 12 days ago
- 4.Procurement window narrowingConfirmedSpec lock in 60d · stage Specification
Top Cooling Conversion Targets
Ranked accounts to pursue this quarter — filtered by vendor archetype
18 targets$828M pipeline
Scoring: vendor fit + procurement window + spec-lock urgency + spend − incumbency
Retrofit Opportunity Engine
Facilities ranked by AI growth pressure × thermal constraint × procurement openness
Cooling Vendor Penetration Matrix
Supplier presence across tracked facilities
Thermal Risk Monitor
Cross-portfolio risk profile
Density
82
Water
58
Power
74
Retrofit
66
AI Cooling Copilot
Ask the dataset · synthetic insight engine
Sample prompts
Based on the current dataset, the highest-conviction direct-to-chip migration candidates are concentrated in Northern Virginia, Phoenix, and Frankfurt — driven by GB200 deployments at >100 kW/rack and air-cooled installed base.
Top 3 facilities by retrofit probability:
• Loudoun AI-7 (Microsoft) — 91% probability, $48M est. cooling spend, RFP stage
• Dallas Hyperscale-3 (CoreWeave) — 87%, $39M, Specification stage
• Frankfurt IDC-9 (Equinix) — 84%, $42M, Vendor Shortlist
EPC influence concentrates around DPR, Jacobs, and Mercury Engineering — collectively touching 62% of in-flight liquid-cooling specifications. Recommend coordinated outreach with EPC design teams 4-6 weeks ahead of spec lock windows.